The walls of the house were increased to 2”x6” equivalent by adding to the original 2”x4” studding. R24 insulation was put in the walls. New strapping and wood siding was added to the original wall exterior of barn board, chip lap wood siding and stucco. Blown-in R80 Atticat insulation was added to the attic which, along with the increased wall thickness and new insulation in the walls, made the house significantly more energy efficient.
Also added was all new plumbing with 3/4 inch piping from a plumbing manifold providing water at equal pressure and sufficient flow to each of the three full 3-piece bathrooms, the kitchen, and the laundry. Counters in the three new custom tiled bathrooms and the kitchen were fitted with properly sealed granite tops that are durable, heat resistant, impervious to staining, non-fading, and aesthetically pleasing.
The new 200 amp electric power supply to the house was installed underground. The house was completely rewired to the electrical code providing power for multiple wall mount TVs, an in-home theatre, a house-wide sound system, and a full security system. The electric lighting in the house was done with Light Emitting Diode (LED) pot lights and LED bulbs in all fixtures to minimize energy consumption.